Xionggu--China to Myanmar pipeline case

2019-05-15 20:30:38 

According to Xionggu,The pipeline is a strategic energy channel in the southwest of China. It is laid in parallel with the Chia- Myanmar crude oil pipeline. The starting point of the main pipeline is Kyaukpyu, Myanmar. The total length of the mainline is 2520 km, of which 1727 km inside China. The diameter of the pipeline is 1016 mm, pressure is 10 MPa, and capacity is 12 billion m3/a. Xionggu MPS-500 welding machine has been applied. There are more than 10000 pcs Xionggu welding machine which have been applied in total. Performance and reliability of Xionggu welding machine have been acknowledged by EPC contractors.